River City Bicycles Mt Tabor Series update

Kevin Hedahl

2008-03-21

The section affected is the flat section at the bottom of the hill, directly
in front of the water tower. They already have a trailer parked down there,
and within the next couple weeks they will be having construction vehicles
parked in the area. I'm not sure about their plans after that.

/kevin hedahl

2008/3/21 NW Cyclist :

> What section(s) of the original course would be affected by the Water
> Bureau's Project ?
>
> These routes are very interesting, however there may be some challenges to
> overcome. Both of these Routes would have a very long & fast downhill (on
> *super crappy* pavement with potholes) leading into a narrow hairpin
> turn. Also near Reservoir # 1 (going back onto the original course) there
> is a metal grate across the entire road that would have to be covered (and
> maintained). Since this course would be new to the locals, you would need
> many more volunteers at strategic points to keep pedestrians off the
> course. Finally Both of these routes go on to City Streets that are *not*closed to traffic on Wednesday nights, so the some additional logistics will
> have to be worked out with the Parks Dept & the City.
>
>
>
>
>
> On 3/20/08, Clark Ritchie wrote:
> >
> > Here are 2 alternate routes that were kindly sent to me earlier:
> >
> > http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of
> > climbing
> >
> > http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of
> > climbing
> >
> > I am thinking of mixing it up this year--maybe we do different routes,
> > twice each, over six races? Have to see what the Parks Dept. says.
> >
> > --Clark
> >
> >
> >
> >
> >
> > On Thu, Mar 20, 2008 at 3:49 PM, wrote:
> >
> > > Seems like there's a couple possible loops looking at it from the
> > > google map. I say the more technical, the better. Please keep it on the
> > > road, this "let's pretend we're belgian" thing can stay on the cross course,
> > > as far as I'm concerned ;)
> > >
> > > Joe King
> > >
> > > 2008/3/20 Clark Ritchie :
> > >
> > > > Great idea. The Parks Dept., however, is very strict about usage
> > > > at Mt Tabor. I feel confident in saying that this would never fly.
> > > >
> > > > I did receive some useful suggestions from other list members, thank
> > > > you. I really don't think construction will be an issue, but you never
> > > > know... this is all very much plan "B" planning.
> > > >
> > > > --Clark
> > > >
> > > >
> > > >
> > > > On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer <
> > > > TSchauer@mackaysposito.com> wrote:
> > > >
> > > > > How about a part road, part gravel path Kermesse?
> > > > >
> > > > >
> > > > >
> > > > > *From:* obra-bounces@list.obra.org [mailto:
> > > > > obra-bounces@list.obra.org] *On Behalf Of *Clark Ritchie
> > > > > *Sent:* Thursday, March 20, 2008 10:05 AM
> > > > > *To:* OBRA
> > > > > *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
> > > > >
> > > > >
> > > > >
> > > > > Hi everyone,
> > > > >
> > > > > The Mt Tabor Series is gearing up for another year. River City
> > > > > Bicycles has stepped up, once again, to be the title sponsor. Thank you,
> > > > > River City.
> > > > >
> > > > > However, I just learned that the Water Bureau is prepping for a
> > > > > Reservoir Replacement Project. They plan to upgrade cameras and poles,
> > > > > install alarms, microphone sensors, repair windows and walkways, etc. This
> > > > > project might affect our route and the Parks Dept. is encouraging me to
> > > > > think of alternative routes. Given the limited pavement around Mt Tabor, I
> > > > > honestly don't know of many other options.
> > > > >
> > > > > The Water Bureau is reviewing the construction schedule and will
> > > > > let me know as soon as possible which areas will be affected. I'll post
> > > > > more when I know more.
> > > > >
> > > > > http://www.mttaborseries.com/
> > > > >
> > > > > Thank you.
> > > > >
> > > > > --Clark
> > > > >
> > > >
> > > >
> > > >
> > > > --
> > > > Clark Ritchie 503.936.2575
> > > >
> > > > _______________________________________________
> > > > OBRA mailing list
> > > > obra@list.obra.org
> > > > http://list.obra.org/mailman/listinfo/obra
> > > > Unsubscribe: obra-unsubscribe@list.obra.org
> > > >
> > > >
> > > >
> > >
> > >
> >
> >
> > --
> > Clark Ritchie 503.936.2575
> >
> > _______________________________________________
> > OBRA mailing list
> > obra@list.obra.org
> > http://list.obra.org/mailman/listinfo/obra
> > Unsubscribe: obra-unsubscribe@list.obra.org
> >
> >
>
> _______________________________________________
> OBRA mailing list
> obra@list.obra.org
> http://list.obra.org/mailman/listinfo/obra
> Unsubscribe: obra-unsubscribe@list.obra.org
>
>


NW Cyclist

2008-03-21

What section(s) of the original course would be affected by the Water
Bureau's Project ?

These routes are very interesting, however there may be some challenges to
overcome. Both of these Routes would have a very long & fast downhill (on
*super crappy* pavement with potholes) leading into a narrow hairpin turn.
Also near Reservoir # 1 (going back onto the original course) there is a
metal grate across the entire road that would have to be covered (and
maintained). Since this course would be new to the locals, you would need
many more volunteers at strategic points to keep pedestrians off the
course. Finally Both of these routes go on to City Streets that are
*not*closed to traffic on Wednesday nights, so the some additional
logistics will
have to be worked out with the Parks Dept & the City.

On 3/20/08, Clark Ritchie wrote:
>
> Here are 2 alternate routes that were kindly sent to me earlier:
>
> http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of
> climbing
>
> http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of
> climbing
>
> I am thinking of mixing it up this year--maybe we do different routes,
> twice each, over six races? Have to see what the Parks Dept. says.
>
> --Clark
>
>
>
>
>
> On Thu, Mar 20, 2008 at 3:49 PM, wrote:
>
> > Seems like there's a couple possible loops looking at it from the google
> > map. I say the more technical, the better. Please keep it on the road, this
> > "let's pretend we're belgian" thing can stay on the cross course, as far as
> > I'm concerned ;)
> >
> > Joe King
> >
> > 2008/3/20 Clark Ritchie :
> >
> > > Great idea. The Parks Dept., however, is very strict about usage at
> > > Mt Tabor. I feel confident in saying that this would never fly.
> > >
> > > I did receive some useful suggestions from other list members, thank
> > > you. I really don't think construction will be an issue, but you never
> > > know... this is all very much plan "B" planning.
> > >
> > > --Clark
> > >
> > >
> > >
> > > On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer <
> > > TSchauer@mackaysposito.com> wrote:
> > >
> > > > How about a part road, part gravel path Kermesse?
> > > >
> > > >
> > > >
> > > > *From:* obra-bounces@list.obra.org [mailto:
> > > > obra-bounces@list.obra.org] *On Behalf Of *Clark Ritchie
> > > > *Sent:* Thursday, March 20, 2008 10:05 AM
> > > > *To:* OBRA
> > > > *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
> > > >
> > > >
> > > >
> > > > Hi everyone,
> > > >
> > > > The Mt Tabor Series is gearing up for another year. River City
> > > > Bicycles has stepped up, once again, to be the title sponsor. Thank you,
> > > > River City.
> > > >
> > > > However, I just learned that the Water Bureau is prepping for a
> > > > Reservoir Replacement Project. They plan to upgrade cameras and poles,
> > > > install alarms, microphone sensors, repair windows and walkways, etc. This
> > > > project might affect our route and the Parks Dept. is encouraging me to
> > > > think of alternative routes. Given the limited pavement around Mt Tabor, I
> > > > honestly don't know of many other options.
> > > >
> > > > The Water Bureau is reviewing the construction schedule and will let
> > > > me know as soon as possible which areas will be affected. I'll post more
> > > > when I know more.
> > > >
> > > > http://www.mttaborseries.com/
> > > >
> > > > Thank you.
> > > >
> > > > --Clark
> > > >
> > >
> > >
> > >
> > > --
> > > Clark Ritchie 503.936.2575
> > >
> > > _______________________________________________
> > > OBRA mailing list
> > > obra@list.obra.org
> > > http://list.obra.org/mailman/listinfo/obra
> > > Unsubscribe: obra-unsubscribe@list.obra.org
> > >
> > >
> > >
> >
> >
>
>
> --
> Clark Ritchie 503.936.2575
>
> _______________________________________________
> OBRA mailing list
> obra@list.obra.org
> http://list.obra.org/mailman/listinfo/obra
> Unsubscribe: obra-unsubscribe@list.obra.org
>
>


Bret Berner

2008-03-21

Isn't that slip of road next res 1 a little narrow, Like a 1/2 to 1/4 narrower than the main course, for a mass start race....

________________________________
> Date: Thu, 20 Mar 2008 14:31:36 -0700
> From: mbenno@yahoo.com
> To: race@mttaborseries.com; obra@list.obra.org
> Subject: Re: [OBRA Chat] River City Bicycles Mt Tabor Series Update
>
> Compare those two alternatives to the original route
> http://veloroutes.org/bikemaps/?route=8451 Lap: 1.3-miles, 201-Ft of Climbing.
>
> Both those alternates have a lot more climbing! Could be pretty darn brutal weekday race!
>
> ----- Original Message ----
> From: Clark Ritchie


Michael Mann

2008-03-20

And depending on the direction, it's either a screamer downhill into a hairpin turn on the south side, or a double-digit grade up from that corner. Ouch.

Michael Benno said:
Compare those two alternatives to the original route
[ http://veloroutes.org/bikemaps/?route=8451 ]http://veloroutes.org/bikemaps/?route=8451 Lap: 1.3-miles, 201-Ft of Climbing.

Both those alternates have a lot more climbing! Could be pretty darn brutal weekday race!

----- Original Message ----
From: Clark Ritchie
To: OBRA
Sent: Thursday, March 20, 2008 12:52:40 PM
Subject: Re: [OBRA Chat] River City Bicycles Mt Tabor Series Update

Here are 2 alternate routes that were kindly sent to me earlier:

[ http://veloroutes.org/bikemaps/?route=8444 ]http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of climbing
[ http://veloroutes.org/bikemaps/?route=8446 ]http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of climbing

I am thinking of mixing it up this year--maybe we do different routes, twice each, over six races? Have to see what the Parks Dept. says.

--Clark


tackyglueit

2008-03-20

Pir is too flat, anyone can sit in; tabor is now too hilly, no one will come
race it........... im laughing..........just can't win.

2008/3/20 Michael Benno :

> Compare those two alternatives to the original route
> http://veloroutes.org/bikemaps/?route=8451 Lap: 1.3-miles, 201-Ft of
> Climbing.
>
> Both those alternates have a lot more climbing! Could be pretty darn
> brutal weekday race!
>
> ----- Original Message ----
> From: Clark Ritchie
> To: OBRA
> Sent: Thursday, March 20, 2008 12:52:40 PM
> Subject: Re: [OBRA Chat] River City Bicycles Mt Tabor Series Update
>
> Here are 2 alternate routes that were kindly sent to me earlier:
>
> http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of
> climbing
>
> http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of
> climbing
>
> I am thinking of mixing it up this year--maybe we do different routes,
> twice each, over six races? Have to see what the Parks Dept. says.
>
> --Clark
>
>
>
>
>
> On Thu, Mar 20, 2008 at 3:49 PM, wrote:
>
> > Seems like there's a couple possible loops looking at it from the google
> > map. I say the more technical, the better. Please keep it on the road, this
> > "let's pretend we're belgian" thing can stay on the cross course, as far as
> > I'm concerned ;)
> >
> > Joe King
> >
> > 2008/3/20 Clark Ritchie :
> >
> > > Great idea. The Parks Dept., however, is very strict about usage at
> > > Mt Tabor. I feel confident in saying that this would never fly.
> > >
> > > I did receive some useful suggestions from other list members, thank
> > > you. I really don't think construction will be an issue, but you never
> > > know... this is all very much plan "B" planning.
> > >
> > > --Clark
> > >
> > >
> > >
> > > On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer <
> > > TSchauer@mackaysposito.com> wrote:
> > >
> > > > How about a part road, part gravel path Kermesse?
> > > >
> > > >
> > > >
> > > > *From:* obra-bounces@list.obra.org [mailto:
> > > > obra-bounces@list.obra.org] *On Behalf Of *Clark Ritchie
> > > > *Sent:* Thursday, March 20, 2008 10:05 AM
> > > > *To:* OBRA
> > > > *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
> > > >
> > > >
> > > >
> > > > Hi everyone,
> > > >
> > > > The Mt Tabor Series is gearing up for another year. River City
> > > > Bicycles has stepped up, once again, to be the title sponsor. Thank you,
> > > > River City.
> > > >
> > > > However, I just learned that the Water Bureau is prepping for a
> > > > Reservoir Replacement Project. They plan to upgrade cameras and poles,
> > > > install alarms, microphone sensors, repair windows and walkways, etc. This
> > > > project might affect our route and the Parks Dept. is encouraging me to
> > > > think of alternative routes. Given the limited pavement around Mt Tabor, I
> > > > honestly don't know of many other options.
> > > >
> > > > The Water Bureau is reviewing the construction schedule and will let
> > > > me know as soon as possible which areas will be affected. I'll post more
> > > > when I know more.
> > > >
> > > > http://www.mttaborseries.com/
> > > >
> > > > Thank you.
> > > >
> > > > --Clark
> > > >
> > >
> > >
> > >
> > > --
> > > Clark Ritchie 503.936.2575
> > > _______________________________________________
> > > OBRA mailing list
> > > obra@list.obra.org
> > > http://list.obra.org/mailman/listinfo/obra
> > > Unsubscribe: obra-unsubscribe@list.obra.org
> > >
> > >
> >
>
>
> --
> Clark Ritchie 503.936.2575
>
>
> ------------------------------
> Never miss a thing. Make Yahoo your homepage.
>
> _______________________________________________
> OBRA mailing list
> obra@list.obra.org
> http://list.obra.org/mailman/listinfo/obra
> Unsubscribe: obra-unsubscribe@list.obra.org
>
>


Michael Benno

2008-03-20

Compare those two alternatives to the original route
http://veloroutes.org/bikemaps/?route=8451 Lap: 1.3-miles, 201-Ft of Climbing.

Both those alternates have a lot more climbing! Could be pretty darn brutal weekday race!

----- Original Message ----
From: Clark Ritchie
To: OBRA
Sent: Thursday, March 20, 2008 12:52:40 PM
Subject: Re: [OBRA Chat] River City Bicycles Mt Tabor Series Update

Here are 2 alternate routes that were kindly sent to me earlier:

http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of climbing
http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of climbing

I am thinking of mixing it up this year--maybe we do different routes, twice each, over six races? Have to see what the Parks Dept. says.

--Clark

On Thu, Mar 20, 2008 at 3:49 PM, wrote:

Seems like there's a couple possible loops looking at it from the google map. I say the more technical, the better. Please keep it on the road, this "let's pretend we're belgian" thing can stay on the cross course, as far as I'm concerned ;)

Joe King

2008/3/20 Clark Ritchie :

Great idea. The Parks Dept., however, is very strict about usage at Mt Tabor. I feel confident in saying that this would never fly.

I did receive some useful suggestions from other list members, thank you. I really don't think construction will be an issue, but you never know... this is all very much plan "B" planning.

--Clark

On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer wrote:

How about a part road, part gravel path Kermesse?

From: obra-bounces@list.obra.org [mailto:obra-bounces@list.obra.org] On Behalf Of Clark Ritchie
Sent: Thursday, March 20, 2008 10:05 AM
To: OBRA
Subject: [OBRA Chat] River City Bicycles Mt Tabor Series Update

Hi everyone,

The Mt Tabor Series is gearing up for another year. River City Bicycles has stepped up, once again, to be the title sponsor. Thank you, River City.

However, I just learned that the Water Bureau is prepping for a Reservoir Replacement Project. They plan to upgrade cameras and poles, install alarms, microphone sensors, repair windows and walkways, etc. This project might affect our route and the Parks Dept. is encouraging me to think of alternative routes. Given the limited pavement around Mt Tabor, I honestly don't know of many other options.

The Water Bureau is reviewing the construction schedule and will let me know as soon as possible which areas will be affected. I'll post more when I know more.

http://www.mttaborseries.com/

Thank you.

--Clark

--
Clark Ritchie 503.936.2575

_______________________________________________
OBRA mailing list
obra@list.obra.org
http://list.obra.org/mailman/listinfo/obra
Unsubscribe: obra-unsubscribe@list.obra.org

--
Clark Ritchie 503.936.2575

____________________________________________________________________________________
Be a better friend, newshound, and
know-it-all with Yahoo! Mobile. Try it now. http://mobile.yahoo.com/;_ylt=Ahu06i62sR8HDtDypao8Wcj9tAcJ


Harry Phinney

2008-03-20

I _think_ the national championships were at Tabor in 1967, but I know
nothing about the precise course used. The '71 Nats were (IIRC) held at the
"old nationals course" AKA the Baptist Bible College course in Salem.

Harry Phinney

-----Original Message-----
From: obra-bounces@list.obra.org [mailto:obra-bounces@list.obra.org] On
Behalf Of David Auker
Sent: Thursday, March 20, 2008 12:48 PM
To: Clark Ritchie
Cc: OBRA
Subject: Re: [OBRA Chat] River City Bicycles Mt Tabor Series Update

Somewhat related: sometime around 1970 the US Road Nationals were held
on Tabor...that must have been a really tough course! (and they used a
larger circuit than what we currently use...this was before my time,
anyone know what the course was??? what year???)

-David

Clark Ritchie wrote:
> Great idea. The Parks Dept., however, is very strict about usage at
> Mt Tabor. I feel confident in saying that this would never fly.
>
> I did receive some useful suggestions from other list members, thank
> you. I really don't think construction will be an issue, but you
> never know... this is all very much plan "B" planning.
>
> --Clark
>
>
>
> On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer
> > wrote:
>
> How about a part road, part gravel path Kermesse?
>
>
>
> *From:* obra-bounces@list.obra.org
>
> [mailto:obra-bounces@list.obra.org
> ] *On Behalf Of *Clark Ritchie
> *Sent:* Thursday, March 20, 2008 10:05 AM
> *To:* OBRA
> *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
>
>
>
> Hi everyone,
>
> The Mt Tabor Series is gearing up for another year. River City
> Bicycles has stepped up, once again, to be the title sponsor.
> Thank you, River City.
>
> However, I just learned that the Water Bureau is prepping for a
> Reservoir Replacement Project. They plan to upgrade cameras and
> poles, install alarms, microphone sensors, repair windows and
> walkways, etc. This project might affect our route and the Parks
> Dept. is encouraging me to think of alternative routes. Given the
> limited pavement around Mt Tabor, I honestly don't know of many
> other options.
>
> The Water Bureau is reviewing the construction schedule and will
> let me know as soon as possible which areas will be affected.
> I'll post more when I know more.
>
> http://www.mttaborseries.com/
>
> Thank you.
>
> --Clark
>
>
>
>
> --
> Clark Ritchie 503.936.2575
> ------------------------------------------------------------------------
>
> _______________________________________________
> OBRA mailing list
> obra@list.obra.org
> http://list.obra.org/mailman/listinfo/obra
> Unsubscribe: obra-unsubscribe@list.obra.org
>

_______________________________________________
OBRA mailing list
obra@list.obra.org
http://list.obra.org/mailman/listinfo/obra
Unsubscribe: obra-unsubscribe@list.obra.org


Clark Ritchie

2008-03-20

Here are 2 alternate routes that were kindly sent to me earlier:

http://veloroutes.org/bikemaps/?route=8444 Lap: 1.6-miles, 401-Ft of
climbing

http://veloroutes.org/bikemaps/?route=8446 Lap: 1.9-miles, 309-Ft of
climbing

I am thinking of mixing it up this year--maybe we do different routes, twice
each, over six races? Have to see what the Parks Dept. says.

--Clark

On Thu, Mar 20, 2008 at 3:49 PM, wrote:

> Seems like there's a couple possible loops looking at it from the google
> map. I say the more technical, the better. Please keep it on the road, this
> "let's pretend we're belgian" thing can stay on the cross course, as far as
> I'm concerned ;)
>
> Joe King
>
> 2008/3/20 Clark Ritchie :
>
> > Great idea. The Parks Dept., however, is very strict about usage at Mt
> > Tabor. I feel confident in saying that this would never fly.
> >
> > I did receive some useful suggestions from other list members, thank
> > you. I really don't think construction will be an issue, but you never
> > know... this is all very much plan "B" planning.
> >
> > --Clark
> >
> >
> >
> > On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer
> > wrote:
> >
> > > How about a part road, part gravel path Kermesse?
> > >
> > >
> > >
> > > *From:* obra-bounces@list.obra.org [mailto:obra-bounces@list.obra.org]
> > > *On Behalf Of *Clark Ritchie
> > > *Sent:* Thursday, March 20, 2008 10:05 AM
> > > *To:* OBRA
> > > *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
> > >
> > >
> > >
> > > Hi everyone,
> > >
> > > The Mt Tabor Series is gearing up for another year. River City
> > > Bicycles has stepped up, once again, to be the title sponsor. Thank you,
> > > River City.
> > >
> > > However, I just learned that the Water Bureau is prepping for a
> > > Reservoir Replacement Project. They plan to upgrade cameras and poles,
> > > install alarms, microphone sensors, repair windows and walkways, etc. This
> > > project might affect our route and the Parks Dept. is encouraging me to
> > > think of alternative routes. Given the limited pavement around Mt Tabor, I
> > > honestly don't know of many other options.
> > >
> > > The Water Bureau is reviewing the construction schedule and will let
> > > me know as soon as possible which areas will be affected. I'll post more
> > > when I know more.
> > >
> > > http://www.mttaborseries.com/
> > >
> > > Thank you.
> > >
> > > --Clark
> > >
> >
> >
> >
> > --
> > Clark Ritchie 503.936.2575
> > _______________________________________________
> > OBRA mailing list
> > obra@list.obra.org
> > http://list.obra.org/mailman/listinfo/obra
> > Unsubscribe: obra-unsubscribe@list.obra.org
> >
> >
>

--
Clark Ritchie 503.936.2575


David Auker

2008-03-20

Somewhat related: sometime around 1970 the US Road Nationals were held
on Tabor...that must have been a really tough course! (and they used a
larger circuit than what we currently use...this was before my time,
anyone know what the course was??? what year???)

-David

Clark Ritchie wrote:
> Great idea. The Parks Dept., however, is very strict about usage at
> Mt Tabor. I feel confident in saying that this would never fly.
>
> I did receive some useful suggestions from other list members, thank
> you. I really don't think construction will be an issue, but you
> never know... this is all very much plan "B" planning.
>
> --Clark
>
>
>
> On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer
> > wrote:
>
> How about a part road, part gravel path Kermesse?
>
>
>
> *From:* obra-bounces@list.obra.org
>
> [mailto:obra-bounces@list.obra.org
> ] *On Behalf Of *Clark Ritchie
> *Sent:* Thursday, March 20, 2008 10:05 AM
> *To:* OBRA
> *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
>
>
>
> Hi everyone,
>
> The Mt Tabor Series is gearing up for another year. River City
> Bicycles has stepped up, once again, to be the title sponsor.
> Thank you, River City.
>
> However, I just learned that the Water Bureau is prepping for a
> Reservoir Replacement Project. They plan to upgrade cameras and
> poles, install alarms, microphone sensors, repair windows and
> walkways, etc. This project might affect our route and the Parks
> Dept. is encouraging me to think of alternative routes. Given the
> limited pavement around Mt Tabor, I honestly don't know of many
> other options.
>
> The Water Bureau is reviewing the construction schedule and will
> let me know as soon as possible which areas will be affected.
> I'll post more when I know more.
>
> http://www.mttaborseries.com/
>
> Thank you.
>
> --Clark
>
>
>
>
> --
> Clark Ritchie 503.936.2575
> ------------------------------------------------------------------------
>
> _______________________________________________
> OBRA mailing list
> obra@list.obra.org
> http://list.obra.org/mailman/listinfo/obra
> Unsubscribe: obra-unsubscribe@list.obra.org
>


Clark Ritchie

2008-03-20

Great idea. The Parks Dept., however, is very strict about usage at Mt
Tabor. I feel confident in saying that this would never fly.

I did receive some useful suggestions from other list members, thank you. I
really don't think construction will be an issue, but you never know... this
is all very much plan "B" planning.

--Clark

On Thu, Mar 20, 2008 at 3:37 PM, Tim Schauer
wrote:

> How about a part road, part gravel path Kermesse?
>
>
>
> *From:* obra-bounces@list.obra.org [mailto:obra-bounces@list.obra.org] *On
> Behalf Of *Clark Ritchie
> *Sent:* Thursday, March 20, 2008 10:05 AM
> *To:* OBRA
> *Subject:* [OBRA Chat] River City Bicycles Mt Tabor Series Update
>
>
>
> Hi everyone,
>
> The Mt Tabor Series is gearing up for another year. River City Bicycles
> has stepped up, once again, to be the title sponsor. Thank you, River City.
>
> However, I just learned that the Water Bureau is prepping for a Reservoir
> Replacement Project. They plan to upgrade cameras and poles, install
> alarms, microphone sensors, repair windows and walkways, etc. This project
> might affect our route and the Parks Dept. is encouraging me to think of
> alternative routes. Given the limited pavement around Mt Tabor, I honestly
> don't know of many other options.
>
> The Water Bureau is reviewing the construction schedule and will let me
> know as soon as possible which areas will be affected. I'll post more when
> I know more.
>
> http://www.mttaborseries.com/
>
> Thank you.
>
> --Clark
>

--
Clark Ritchie 503.936.2575


Tim Schauer

2008-03-20

How about a part road, part gravel path Kermesse?

From: obra-bounces@list.obra.org [mailto:obra-bounces@list.obra.org] On Behalf Of Clark Ritchie
Sent: Thursday, March 20, 2008 10:05 AM
To: OBRA
Subject: [OBRA Chat] River City Bicycles Mt Tabor Series Update

Hi everyone,

The Mt Tabor Series is gearing up for another year. River City Bicycles has stepped up, once again, to be the title sponsor. Thank you, River City.

However, I just learned that the Water Bureau is prepping for a Reservoir Replacement Project. They plan to upgrade cameras and poles, install alarms, microphone sensors, repair windows and walkways, etc. This project might affect our route and the Parks Dept. is encouraging me to think of alternative routes. Given the limited pavement around Mt Tabor, I honestly don't know of many other options.

The Water Bureau is reviewing the construction schedule and will let me know as soon as possible which areas will be affected. I'll post more when I know more.

http://www.mttaborseries.com/

Thank you.

--Clark


Clark Ritchie

2008-03-20

Hi everyone,

The Mt Tabor Series is gearing up for another year. River City Bicycles has
stepped up, once again, to be the title sponsor. Thank you, River City.

However, I just learned that the Water Bureau is prepping for a Reservoir
Replacement Project. They plan to upgrade cameras and poles, install
alarms, microphone sensors, repair windows and walkways, etc. This project
might affect our route and the Parks Dept. is encouraging me to think of
alternative routes. Given the limited pavement around Mt Tabor, I honestly
don't know of many other options.

The Water Bureau is reviewing the construction schedule and will let me know
as soon as possible which areas will be affected. I'll post more when I
know more.

http://www.mttaborseries.com/

Thank you.

--Clark


Clark Ritchie

2004-04-12



There are just under 2 months until the 2004 River

City Bicycles Mt Tabor Series.



This year will be like last year--six races, series

prizes, best 5 of 6 races, final race is worth double

points.



What's new for 2004:



- $12 entry fee with 2 cans of food



- Fixed gear! There will be a FREE 3-lap fixed gear

race at 6:00pm, see website for details



- Free entry for volunteers



http://tinyurl.com/spww









=====



Clark Ritchie



=====





__________________________________

Do you Yahoo!?

Yahoo! Tax Center - File online by April 15th

http://taxes.yahoo.com/filing.html