Mike Murray
2000-05-24
We are planning 2 days to do painting and surface repair at the Alpenrose
Velodrome.
June 3 - we will do surface repair and caulking of the joint between the
track and the apron. THE TRACK WILL BE CLOSED FOR RIDING 6/3 TO 6/6 in
order to allow the caulk to set.
We will need 5 - 10 people to help with this process. Please send me a note
if you are interested in helping.
July 1 - Paint the track day. We will need LOTS of help. This is best if
done like a barn raising. Everybody gets a roller and it will go very fast.
It is actually a lot of fun. If you are into bike racing you should be
there to help.
Mike Murray